1: \begin{abstract}
2: The problem of multi-area interchange scheduling under system uncertainty is considered. A new scheduling technique is proposed for a multi-proxy bus system based on stochastic optimization that captures uncertainty in renewable generation and stochastic load. In particular, the proposed algorithm iteratively optimizes the interface flows using a multidimensional demand and supply functions. Optimality and convergence are guaranteed for both synchronous and asynchronous scheduling under nominal assumptions.
3: \end{abstract}
4: