1: \begin{abstract}
2: % 1. motivation
3: % 2. 主要工作&创新点
4: % 3. 概括性介绍结论:1我们的问题考虑的因素比不考虑好很多 2我们的算法优越 (我们问题研究有价值、我的方法还高效)
5: The electrical collector system (ECS) plays a crucial role in determining the performance of offshore wind farms (OWFs).
6: Existing research has predominantly restricted ECS cable layouts to conventional radial or ring structures and employed graph theory heuristics for solutions.
7: However, both economic efficiency and reliability of the OWFs heavily depend on their ECS structure, and the optimal ECS cable layout often deviates from typical configurations.
8: In this context, this paper introduces a novel reliability-based ECS cable layout planning method for large-scale OWFs, employing a two-stage stochastic programming approach to address uncertainties of wind power and contingencies. To enhance reliability, the model incorporates optimal post-fault network reconfiguration strategies by adjusting wind turbine power supply paths through link cables. To tackle computation challenges arising from numerous contingency scenarios, a customized progressive contingency incorporation (CPCI) framework is developed to solve the model with higher efficiency by iteratively identifying non-trivial scenarios and solving the simplified problems. The convergence and optimality are theoretically proven.
9: Numerical tests on several real-world OWFs validate the necessity of fully optimizing ECS structures and demonstrate the efficiency of the CPCI algorithm.
10:
11: \end{abstract}
12: