1: \begin{abstract}
2: We consider the optimal power management in
3: renewable driven smart building MicroGrid under noise corrupted
4: conditions as a stochastic optimization problem. We
5: first propose our user satisfaction and electricity consumption
6: balanced (USECB) profit model as the objective for optimal power
7: management. We then cast the problem in noise corrupted
8: conditions into the class of expectation maximizing in stochastic
9: optimization problem with convex constraints. For this task, we
10: design a Bregemen projection based mirror decent algorithm
11: as an approximation solution to our stochastic optimization
12: problem. Convergence and upper-bound of our algorithm with
13: proof are also provided in our paper. We then conduct a broad
14: type of experiment in our simulation to test the justification of
15: our model as well as the effectiveness of our algorithm.
16: \end{abstract}
17: